POP: 02 July – 05 August (34 Days)
Location: Lima Pier
USNS WSC MTA was conducted at Lima Pier in PACDIM SRF. The MTA was 34 days long requiring trades mostly in structural, painter/blasting, shipwrights, and outside machinists. The package also required their flight deck to be renewed in accordance with their 5 year AVCERT inspection. Other subcontractors required on this package were life raft annual certifications, MOV Controller Repairs, FM 200 Annual Testing, and Galley and Laundry ducting cleaning.