USS Frank Cable VRA

POP: 10 August – 30 September (51 Days)

Location: Alpha Pier

USS FCB VRA is currently in progress at Alpha Pier in Polaris Point. This package should last 50 days requiring trades mostly in structural and mechanical shops.

DUNS Number: 855022141

© 2020 Cabras Marine Corporation. All rights reserved.

178 Industrial Avenue Piti, GU 96915