POP: 01 April – 11 May (42 Days)
Location: Lima Pier
USNS JEC MTA was conducted at Lima Pier in PACDIM SRF. The MTA was 42 days long requiring various trades such as outside machinists, structural, electricians, pipe fitters, etc. The package was also heavy in specialized subcontractors for Diesel Engine overhauls, Life Boat renewals, Circuit Breaker cleaning, Rescue Boat repairs, and Galley cleaning.
