USCG Washington Loading Operations

As the USCG Washington vessel was decommissioned and ultimately being sent off, Cabras Marine Corporation transported the Washington from our AFDL-1 Drydock to Anchorage at Apra Harbor. Once the Washington was at anchorage, Cabras positioned the Washington and assisted with loading operations onto the M/V Ocean Grand. Cabras personnel secured the cradle and containers onto the M/V Ocean Grand prior to overseeing loading operations. The total evolution for operations lasted 48 hours.

DUNS Number: 855022141

© 2020 Cabras Marine Corporation. All rights reserved.

178 Industrial Avenue Piti, GU 96915